Review our points breakdown for the LEED v4 credits for Building Operations and Maintenance.

This article is part of a series that provides an overview of the requirements and options in LEED.

In a previous article, we listed the prerequisites, credits and points in the LEED BD+C rating system. This time around, we’re going to focus on LEED for Operations and Maintenance (LEED O+M). This rating system addresses the following existing building project types:

  • Schools
  • Retail
  • Data centers
  • Warehouses and distribution centers
  • Hospitality
  • Existing buildings (everything not covered in the bullets above)

In the chart below, we’ve outlined all of the prerequisites and credits as well as the maximum number of points you can earn for each credit in this rating system.

LEED O+M prerequisites and credits

C = Credit; P = Prerequisite

Location and Transportation

Credit/Prerequisite Name Existing Buildings Schools Retail Data Centers Warehouses and Distribution Centers Hospitality
Alternative Transportation (C) 15 15 15 15 15 15

Sustainable Sites

Credit/Prerequisite Name Existing Buildings Schools Retail Data Centers Warehouses and Distribution Centers Hospitality
Site Management Policy (P) Req'd Req'd Req'd Req'd Req'd Req'd
Site Development—Protect or Restore Habitat (C) 2 2 2 2 2 2
Rainwater Management (C) 3 2 3 3 3 3
Heat Island Reduction (C) 2 2 2 2 2 2
Light Pollution Reduction (C) 1 1 1 1 1 1
Site Management (C) 1 1 1 1 1 1
Site Improvement Plan (C) 1 1 1 1 1 1
Joint Use of Facilities (C) n/a 1 n/a n/a n/a n/a

Water Efficiency

Credit/Prerequisite Name Existing Buildings Schools Retail Data Centers Warehouses and Distribution Centers Hospitality
Indoor Water Use Reduction (P) Req'd Req'd Req'd Req'd Req'd Req'd
Building-Level Water Metering (P) Req'd Req'd Req'd Req'd Req'd Req'd
Outdoor Water Use Reduction (C) 2 2 2 2 2 2
Indoor Water Use Reduction (C) 5 5 5 4 5 5
Cooling Tower Water Use (C) 3 3 3 4 3 3
Water Metering (C) 2 2 2 2 2 2

Energy and Atmosphere

Credit/Prerequisite Name Existing Buildings Schools Retail Data Centers Warehouses and Distribution Centers Hospitality
Energy Efficiency Best Management Practices (P) Req'd Req'd Req'd Req'd Req'd Req'd
Minimum Energy Performance (P) Req'd Req'd Req'd Req'd Req'd Req'd
Building Level Energy Metering (P) Req'd Req'd Req'd Req'd Req'd Req'd
Fundamental Refrigerant Management (P) Req'd Req'd Req'd Req'd Req'd Req'd
Existing Building Commissioning—Analysis (C) 2 2 2 2 2 2
Existing Building Commissioning—Implementation (C) 2 2 2 2 2 2
Ongoing Commissioning (C) 3 3 3 3 3 3
Optimize Energy Performance (C) 20 20 20 20 20 20
Advanced Energy Metering (C) 2 2 2 2 2 2
Demand Response (C) 3 3 3 3 3 3
Renewable Energy and Carbon Offsets (C) 5 5 5 5 5 5
Enhanced Refrigerant Management (C) 1 1 1 1 1 1

Materials and Resources

Credit/Prerequisite Name Existing Buildings Schools Retail Data Centers Warehouses and Distribution Centers Hospitality
Ongoing Purchasing and Waste Policy (P) Req'd Req'd Req'd Req'd Req'd Req'd
Facility Maintenance & Renovation Policy (P) Req'd Req'd Req'd Req'd Req'd Req'd
Purchasing—Ongoing (C) 1 1 1 1 1 1
Purchasing—Lamps (C) 1 1 1 1 1 1
Purchasing—Facility Management and Renovation (C) 2 2 2 2 2 2
Solid Waste Management—Ongoing (C) 2 2 2 2 2 2
Solid Waste Management—Facility Maintenance and Renovation (C) 2 2 2 2 2 2

Indoor Environmental Quality

Credit/Prerequisite Name Existing Buildings Schools Retail Data Centers Warehouses and Distribution Centers Hospitality
Minimum Indoor Air Quality Performance (P) Req'd Req'd Req'd Req'd Req'd Req'd
Environmental Tobacco Smoke Control (P) Req'd Req'd Req'd Req'd Req'd Req'd
Green Cleaning Policy (P) Req'd Req'd Req'd Req'd Req'd Req'd
Indoor Air Quality Management Program (C) 2 2 2 2 2 2
Enhanced Indoor Air Quality Strategies (C) 2 2 2 2 2 2
Thermal Comfort (C) 1 1 1 1 1 1
Interior Lighting (C) 2 2 2 2 2 2
Daylight and Quality Views (C) 4 4 4 4 4 4
Green Cleaning—Custodial Effectiveness Assessment (C) 1 1 1 1 1 1
Green Cleaning—Products and Materials (C) 1 1 1 1 1 1
Green Cleaning Equipment (C) 1 1 1 1 1 1
Integrated Pest Management (C) 2 2 2 2 2 2
Occupant Comfort Survey (C) 1 1 1 1 1 1

Innovation

Credit/Prerequisite Name Existing Buildings Schools Retail Data Centers Warehouses and Distribution Centers Hospitality
Innovation (C) 5 5 5 5 5 5
LEED Accredited Professional (C) 1 1 1 1 1 1

Regional Priority

Credit/Prerequisite Name Existing Buildings Schools Retail Data Centers Warehouses and Distribution Centers Hospitality
Regional Priority (C) 4 4 4 4 4 4

In our next article, we’ll give you an overview of the prerequisites, points and credits in the LEED Interior Design and Construction rating system. 

Check out credits and prerequisites in the LEED Credit Library

USGBC Articles can be accessed in the USGBC app for iOS or Android on your iPhone, iPad or Android device.
iOS App on App StoreAndroid app on Google Play

1 commentLeave a comment

Property/Project Manager, Tate Enterprises
Think there is a typo. Currently written as: Site Development — Project or Restore Habitat (C) Would bet it is supposed to say 'Protect or Restore', not 'Project'...

Leave a comment Don't have an account? Create one

You must be signed in to leave a comment.