System Downtime Notification
From Saturday, August 30, 2014 from 8:00 am EST to 11:59 pm EST, usgbc.org will be offline for site maintenance.
Email us or call 1-800-795-1747 for assistance. Thanks for your patience.
Please upgrade your browser. This site requires a newer version to work correctly. Read more

LEED Stories from Practice Case Study:Liberty Centre

Format On Demand: Article/Print
Offered by U.S. Green Building Council
Price $65.00
Category Other

Learn how, through an integrative approach, one project team accomplished a return on investment that includes an 11% reduction int otal energy consumption and a nearly-95% tenant retention rate! And, earn credential maintenance hours.This e-book brings to life the visioning, design, construction, and operation of the Liberty Centre, located in Portland, Oregon, and Silver-certified u n der LEED for Existing Buildings v2.0. Read perspectives from diverse LEED project team members: owner, property manager, sustai nab ility consultant, operations manager, and building engineer.Liberty Centre is a 17-story, 278,000-square-foot office buildin g

Objectives

  • Recognize notable green building strategies used in LEED-certified projects. 
  • Compare perspectives of multipleLEED project stakeholders.
  • Evaluate lessons learned from LEED project experiences.
  • Identify effective tools and processes for successful LEED implementation.
  • Identify elements of an integrative process on LEED projects as a pathway to success.
Purchase now
  • Share on Twitter
  • Share on Facebook
  • Share on LinkedIn
CE Hours 2.0
AIA/CES (LU) 2.0
CSI (CEU) 2.0
BOMI (CPD) 2.0
Corenet (CPD) 2.0