System Downtime Notification
From Saturday, August 30, 2014 from 8:00 am EST to 11:59 pm EST, usgbc.org will be offline for site maintenance.
Email us or call 1-800-795-1747 for assistance. Thanks for your patience.
Please upgrade your browser. This site requires a newer version to work correctly. Read more
Our "watch" feature allows you to stay current on all aspects of this specific credit. In your account, you can control what you get updated on and how you receive your notifications. Hide

Mold prevention

EQ6.4 | Possible point

Intent

To reduce the potential presence of mold in schools through preventive design and construction measures.

Reduce the potential presence of mold in schools through preventive design and construction measures.

To reduce the potential presence of mold in schools through preventive design and construction measures.

Requirements

Project teams must achieve the following credits:

  • IEQ Credit 3.1: Construction Indoor Air Quality Management Plan—During Construction
  • IEQ Credit 7.1: Thermal Comfort—Compliance
  • IEQ Credit 7.2: Thermal Comfort—Verification

Provide heating, ventilating and air conditioning (HVAC) systems and controls designed to limit space relative humidity to 60% or less during all load conditions, both occupied and unoccupied.

Develop and implement on an ongoing basis an IAQ management program for buildings based on the U.S. Environmental Protection Agency (EPA) document, Building Air Quality: A Guide for Building Owners and Facility Managers, EPA reference number 402-F-91-102, December 1991.

Project teams must achieve the following credits:

  1. EQ Credit 3.1: Construction IAQ management plan: during construction
  2. EQ Credit 7.1: Thermal comfort: compliance
  3. EQ Credit 7.2: Thermal comfort: verification

AND

Provide HVAC systems and controls designed to limit space relative humidity to 60% or less during all load conditions, both occupied and unoccupied.

AND

Develop and implement on an ongoing basis an IAQ management program for buildings based on the EPA document “Building Air Quality: A Guide for Building Owners and Facility Managers,” EPA Reference Number 402-F-91-102, December 1991.

Project teams must achieve the following credits:

  • IEQ Credit 3.1: Construction Indoor Air Quality Management Plan—During Construction
  • IEQ Credit 7.1: Thermal Comfort—Compliance
  • IEQ Credit 7.2: Thermal Comfort—Verification

Provide heating, ventilating and air conditioning (HVAC) systems and controls designed to limit space relative humidity to 60% or less during all load conditions, both occupied and unoccupied.

Develop and implement on an ongoing basis an IAQ management program for buildings based on the U.S. Environmental Protection Agency (EPA) document, Building Air Quality: A Guide for Building Owners and Facility Managers, EPA reference number 402-F-91-102, December 1991.

Core & Shell: Designers must have control over all relevant aspects of HVAC design.
EB:O&M: Project team must have control over all relevant aspects of HVAC design.
Commercial Interiors: Tenants must have control over all relevant aspects of HVAC design.
Retail - Commercial Interiors: Tenants must have control over all relevant aspects of HVAC design.
Join LEEDuser

Ask questions, share tips, and get notified of new forum posts by joining LEEDuser, a tool developed by BuildingGreen and supported by USGBC!

  • Share on Twitter
  • Share on Facebook
  • Share on LinkedIn
  • Print to PDF
Sample forms
View sample forms