EA Credit: Existing Building Commissioning – Implementation

  • Remember that to earn this credit, EAc Existing Building Commissioning - Analysis must be attempted and earned.
  • All no- or low-cost measures identified as part of the process for EAc Existing Building Commissioning - Analysis are required to be implemented.
  • Ensure that a copy of the five-year capital plan is provided, and includes a timetable for implementation.
  • Remember that this credit builds off of the commissioning plan or ASHRAE Level II Audit performed for EAc: Existing Building Commissioning—Analysis; therefore, the implemented low/no cost measures are required to be a result of the ongoing commissioning exercise or ASHRAE Level II Audit, not the ASHRAE Level I Audit.
  • Be sure to provide details on the training program to provide building operations staff with thorough knowledge of how to operate new or significantly altered equipment.
  • Be sure to update the operations and maintenance plan and the current facilities requirements as needed to incorporate the newly implemented improvements.