Please upgrade your browser. This site requires a newer version to work correctly. Read more
Our "watch" feature allows you to stay current on all aspects of this specific credit. In your account, you can control what you get updated on and how you receive your notifications. Hide

| v2 - LEED 2.0

Outside air introduction and exhaust systems

EQp1 | Required

Intent

Establish minimum indoor air quality (IAQ) performance to enhance indoor air quality in buildings, thus contributing to the health and well-being of the occupants.

Requirements

  • Modify or maintain existing building outside-air (OA) ventilation distribution system to supply at least the outdoor air ventilation rate required by ASHRAE 62.1-2004. If this is not feasible due to the physical constraints of the existing ventilation system, modify or maintain the system to supply at least 10 cubic feet per minute (CFM) per person.
  • Implement and maintain an HVAC System Maintenance Program to ensure the proper operations and maintenance of HVAC components as they relate to IAQ.
  • Test and maintain the operation of all building exhaust systems, including bathroom, shower, kitchen and parking exhaust system.
Join LEEDuser

Ask questions, share tips, and get notified of new forum posts by joining LEEDuser, a tool developed by BuildingGreen and supported by USGBC!

  • Share on Twitter
  • Share on Facebook
  • Share on LinkedIn
  • Print to PDF
Sample forms
View sample forms

0 commentsLeave a comment

Leave a comment Don't have an account? Create one

You must be signed in to leave a comment.