Please upgrade your browser. This site requires a newer version to work correctly. Read more
Our "watch" feature allows you to stay current on all aspects of this specific credit. In your account, you can control what you get updated on and how you receive your notifications. Hide

LEED O+M: Existing Buildings | v2 - LEED 2.0

Source reduction and waste management - waste management policy and waste stream audit

MRp1.1 | Required

Intent

Establish minimum source reduction and recycling program elements and quantify current waste stream production volume.

Requirements

Conduct a waste stream audit of the ongoing waste stream (not specific upgrade project waste) to establish a current building waste baseline that identifies the types of waste making up the waste stream and amounts of each type of waste in the waste stream. At a minimum, the audit should determine the amounts for paper, glass, plastics, cardboard and metals in the waste stream. Identify opportunities for source reduction and diversion. Operate over the performance period a waste reduction policy to reduce waste stream through source reduction purchasing strategies, collection station equipment, recycling and occupant education.

Join LEEDuser

Ask questions, share tips, and get notified of new forum posts by joining LEEDuser, a tool developed by BuildingGreen and supported by USGBC!

  • Share on Twitter
  • Share on Facebook
  • Share on LinkedIn
  • Print to PDF
Sample forms
View sample forms

0 commentsLeave a comment

Leave a comment Don't have an account? Create one

You must be signed in to leave a comment.