Please upgrade your browser. This site requires a newer version to work correctly. Read more
Our "watch" feature allows you to stay current on all aspects of this specific credit. In your account, you can control what you get updated on and how you receive your notifications. Hide

| v2 - LEED 2.0

Source reduction and waste management - storage and collection of recyclables

MRp1.2 | Required

Intent

Facilitate the reduction of waste generated by building occupants that is hauled to and disposed of in landfills or through incineration.

Requirements

Provide an easily accessible area that serves the entire building and is dedicated to the separation, collection and storage of materials for recycling. The recycling area needs to include (at a minimum) space for paper, glass, plastics, cardboard and metals. Recycling area capacity needs to be designed to accommodate at a minimum the potential recycling volumes identified in the waste stream audit for paper, corrugated cardboard, glass, plastics and metals.

If it can be documented for an existing building that there are no public or private recycling services available within the region where the building is located (within 50 miles of the building) for one or more of the identified materials, the building will be granted an exception to the requirement in this prerequisite for the identified material.

Join LEEDuser

Ask questions, share tips, and get notified of new forum posts by joining LEEDuser, a tool developed by BuildingGreen and supported by USGBC!

  • Share on Twitter
  • Share on Facebook
  • Share on LinkedIn
  • Print to PDF
Sample forms
View sample forms

0 commentsLeave a comment

Leave a comment Don't have an account? Create one

You must be signed in to leave a comment.