Please upgrade your browser. This site requires a newer version to work correctly. Read more
Our "watch" feature allows you to stay current on all aspects of this specific credit. In your account, you can control what you get updated on and how you receive your notifications. Hide

LEED O+M: Existing Buildings | v3 - LEED 2008

Sustainable purchasing policy

MRp1 | Required

Intent

To reduce the environmental harm from materials purchased, used, and disposed of in the operations within buildings.

Requirements

Have in place an Environmentally Preferable Purchasing (EPP) policy that includes, at a minimum, product purchasing policies for the building and site addressing the requirements of MR Credit 1, Sustainable Purchasing: Ongoing Consumables. This policy must adhere to the LEED for Existing Buildings: O&M policy model (see Introduction). At a minimum, the policy must cover those product purchases that are within the building and site management’s control.

Additionally, extend the EPP policy to include product purchasing policies for the building and site addressing the requirements of at least one of the credits listed below. This extended policy must also adhere to the LEED for Existing Buildings: O&M policy model and specifically address the goal, scope and performance metric for the respective credit:

  • MR Credit 2: Sustainable Purchasing—Durable Goods
  • MR Credit 3: Sustainable Purchasing—Facility Alterations and Additions
  • MR Credit 4: Toxic Material Source Reduction—Reduced Mercury in Lamps

This prerequisite requires only policies, not ongoing actual sustainable performance.

Join LEEDuser

Ask questions, share tips, and get notified of new forum posts by joining LEEDuser, a tool developed by BuildingGreen and supported by USGBC!

  • Share on Twitter
  • Share on Facebook
  • Share on LinkedIn
  • Print to PDF
Sample forms
View sample forms

0 commentsLeave a comment

Leave a comment Don't have an account? Create one

You must be signed in to leave a comment.