LEED O+M: Existing Buildings | v3 - LEED 2009

Rainwater management

Possible 1 point

Intent

Pilot Credit Closed

This pilot credit is closed to new registrations

To reduce runoff volume and improve water quality through replicating the natural hydrology and water balance of the site, based on historical conditions and undeveloped ecosystems in the region.

Requirements

Establishment

Implement at least two of the following strategies to reduce the annual volume of rainwater runoff from the existing site’s baseline condition:

  • Use Low Impact Development (LID) practices to capture and treat water from 25% of the impervious surfaces from 1.2” (30 millimeters) of rainfall;
  • Disconnect 40% of existing directly connected impervious surfaces and redirect to pervious areas;
  • Rainwater collection system capturing and reusing 25% of the runoff from impervious surfaces;
  • Rainwater filtering system to treat water prior to release into public storm drain systems or drainage easements;
  • Reconnect impervious areas to existing green infrastructure systems.

Establish an annual inspection program of all rainwater management facilities to confirm continued performance.

Performance

Employ the annual inspection program of all rainwater management facilities to confirm continued performance. Maintain documentation of inspection, including identification of areas of erosion, maintenance needs, and repairs. Perform all routine required maintenance, necessary repairs or stabilization within 60 days of inspection.

Changes:
  • 1/15/2013: update with SSc4 from LEED v4 draft

    • BD+C: wording changes, the Stormwater Calculator methodology was removed
    • EBOM: Revised requirements to allow for rwm practices currently in place on the EBOM project, and to make the credit more performance-based
Join LEEDuser

Ask questions, share tips, and get notified of new forum posts by joining LEEDuser, a tool developed by BuildingGreen and supported by USGBC!

  • Share on Twitter
  • Share on Facebook
  • Share on LinkedIn
  • Print to PDF
Sample forms

No sample form available for this credit.

View all sample forms