Bird collision deterrence

SSpc55 | Possible 1 point


Reduce bird injury and mortality from in-flight collisions with buildings.


Comply with the “Interior lighting,” “Exterior lighting,” and “Performance monitoring plan” requirements below.

Interior lighting

Limit the total duration of all nighttime lighting programmed ‘on’ to less than 90 minutes per day. Manual override capability may be provided for occasional after-hours use.


Reduce the amount of uplight leaving the building. Any suspended, wall or floor mounted luminaires with a direct line of sight above the horizon, thru any glass windows, skylights or doors must be automatically controlled to turn ‘off’ during all nighttime hours (the time between sunset and sunrise).


Have in place automatic window shades or shielding that limits light transmittance to 10% or less during the nighttime.

Implement a program to ensure that the lighting control system is being properly used to adjust lighting levels during all nighttime hours (the time between sunset and sunrise). .


Exterior lighting

Shield all exterior fixtures (where the sum of the mean lamp lumens for that fixture exceeds 2,500) such that the installed fixtures do not directly emit any light at a vertical angle more than 90 degrees from straight down.



Performance monitoring plan

Develop a three-year initial monitoring plan to routinely monitor the building and site structures for bird collisions. Include methods to identify and document locations where repeated bird strikes occur, the number of collisions, the date, the approximate time (if known), and features that may be contributing to collisions. Also include a process and timeline for corrective action. The monitoring plan is the baseline for the measures implemented during the performance period.

Implement the monitoring plan for a period of three years. If results of the monitoring plan indicate that areas of the building and/or site structures receive multiple collisions, implement corrective action.

General Pilot Documentation Requirements

Register for the pilot credit

Credits 1-14

Credits 15-27

Credits 28-42

Credits 43-56

Credits 57-67

Credits 68-82

Credits 83-103

Credit Specific: EBOM

Interior lighting

  • A lighting schedule listing fixtures, nighttime off-time durations for a typical day (for fixtures controlled locally by occupancy sensors, enter durations corresponding to arrival of the earliest work shift and departure of the latest work shift), and manual override capability. Alternatively, use Table SSc8-1 Interior Perimeter Lighting Off-Time Hours in the EBOM 2009 SSc8 Light Pollution Reduction form.
  • Building plan showing the location of automatic window shades and/or shielding
  • Typical detail and/or cross section of automatic window shades and/or shielding
  • Narrative describing how the lighting control system is maintained to ensure the system is functioning properly. Describe how manual overrides are restored to normal shutoff schedules.

Exterior lighting

  • Luminaire shielding information (e.g., typical detail, manufacturers’ technical data sheets, or photographs)

Performance monitoring plan

  • A copy of the initial monitoring plan
  • Records of all collisions during the Performance Period. Include the location, date, and approximate time of day for each collision.
  • Plan(s) and/or elevation(s) depicting the location of all temporary and permanent materials and shading/screening devices used to retrofit the building façade in response to the results of the monitoring plan.
  • Applicable specification details on all materials and shading/screening devices used to retrofit the building façade in response to the results of the monitoring plan.
  • 10/16/2015:
    Expanded the applicability to all rating systems
    Simplified the lighting requirements
    Adjusted the documentation based on the above changes to Requirements
    Miscellaneous edits to the background information, for reference
Join LEEDuser

Ask questions, share tips, and get notified of new forum posts by joining LEEDuser, a tool developed by BuildingGreen and supported by USGBC!

  • Share on Twitter
  • Share on Facebook
  • Share on LinkedIn
  • Print to PDF
Sample forms

No sample form available for this credit.

View all sample forms

0 commentsLeave a comment

Leave a comment Don't have an account? Create one

You must be signed in to leave a comment.