| v4 - LEED v4

Integrated project planning and design

Required

Intent

Maximize opportunities for integrated, cost-effective adoption of green design and construction strategies, emphasizing human health as a fundamental evaluative criterion for building design, construction and operational strategies. Utilize innovative approaches and techniques for green design and construction.

Requirements

Use cross-discipline design and decision making, beginning in the programming and pre-design phase. At a minimum, ensure the following process:

Owner’s Project Requirements Document.

Prepare an Owner’s Project Requirements (OPR) document. Develop a health mission statement and incorporate it in the OPR. The health mission statement must address "triple bottom line" values—economic, environmental and social. Include goals and strategies to safeguard the health of building occupants, the local community and the global environment, while creating a high-performance healing environment for the building’s patients, caregivers and staff.

Preliminary Rating Goals.

As early as practical and preferably before schematic design, conduct a preliminary LEED meeting with a minimum of four key project team members and the owner or owner’s representative. As part of the meeting, create a LEED® action plan that, at a minimum:

  • Determines the LEED certification level to pursue (Certified, Silver, Gold, or Platinum);
  • Selects the LEED credits to meet the targeted certification level; and
  • Identifies the responsible parties to ensure the LEED requirements for each prerequisite and selected credit are met.
Integrated Project Team.

Assemble an integrated project team and include as many of the following professionals as feasible (minimum of four), in addition to the owner or owner’s representative.

  • Owner’s capital budget manager
  • Architect or building designer
  • Mechanical engineer
  • Structural engineer
  • Energy modeler
  • Equipment planner
  • Acoustical consultant
  • Telecommunications designer
  • Controls designer
  • Food Service Consultant
  • Infection Control Staff
  • Building science or performance testing agents
  • Green building or sustainable design consultant
  • Facility green teams
  • Physician and nursing teams
  • Facility managers
  • Environmental services staff
  • Functional and space programmers
  • Commissioning agent
  • Community representatives
  • Civil engineer
  • Landscape architect
  • Ecologist
  • Land planner
  • Construction manager or general contractor
  • Life cycle cost analyst; construction cost estimator
  • Lighting designer
  • Other disciplines appropriate to the specific project type

Design Charrette.

As early as practical and preferably before schematic design, conduct a minimum four-hour , integrated design charrette with the project team as defined above. The goal is to optimize the integration of green strategies across all aspects of building design, construction and operations, drawing on the expertise of all participants.

Join LEEDuser

Ask questions, share tips, and get notified of new forum posts by joining LEEDuser, a tool developed by BuildingGreen and supported by USGBC!

  • Share on Twitter
  • Share on Facebook
  • Share on LinkedIn
  • Print to PDF
Sample forms
Version: v01
Active Form
View all sample forms

0 commentsLeave a comment

Leave a comment Don't have an account? Create one

You must be signed in to leave a comment.