Please upgrade your browser. This site requires a newer version to work correctly. Read more
Our "watch" feature allows you to stay current on all aspects of this specific credit. In your account, you can control what you get updated on and how you receive your notifications. Hide

LEED BD+C: Homes | v4

Integrative process

Possible 2 points

Intent

To maximize opportunities for cost-effective adoption of integrative green design and construction strategies.

Requirements

Option 1. Integrative project team (1 point)

Assemble and involve a project team to meet the three criteria below:

a) Include team members, in addition to the builder and verification team, whose capabilities include at least three of the following skill sets:

  • architecture or residential building design;
  • mechanical or energy engineering;
  • building science or performance testing;
  • green building or sustainable design; and
  • civil engineering, landscape architecture, habitat restoration, or land-use planning.

b) Involve all team members referenced above in at least three of the following phases of the home design and construction process:

  • conceptual or schematic design;
  • LEED planning;
  • preliminary design;
  • energy and envelope systems analysis or design;
  • design development;
  • final design, working drawings or specifications; and
  • construction.

c) Conduct meetings with the project team at least monthly to review project status, introduce new team members to project goals, discuss problems, formulate solutions, review responsibilities, and identify next steps.

AND/OR

Option 2. Design charrette (1 point)

No later than the design development phase and preferably during schematic design, conduct at least one full-day workshop (or two half-day workshops) with the project team, as defined in Option 1. Use the workshop to integrate green strategies across all aspects of the building design, drawing on the expertise of all participants.

AND/OR

Option 3. Trades training (1 point)

Before construction but after trades have been hired for the project, conduct at least eight hours of training (extending a full day or over several days) on the green aspects of the project and how the trades can contribute to achieving each LEED for Homes prerequisite and attempted credit. Focus on areas where trades have traditionally struggled to meet green building standards. Include at least the following trades in the training:

  • plumbing;
  • mechanical systems;
  • insulation;
  • framing; and
  • air sealing.

Each trade may be present only for the relevant segment, but the builder’s site supervisor must be present throughout so that he or she understands the quality control duties on LEED and green building best practices.

Join LEEDuser

Ask questions, share tips, and get notified of new forum posts by joining LEEDuser, a tool developed by BuildingGreen and supported by USGBC!

  • Share on Twitter
  • Share on Facebook
  • Share on LinkedIn
  • Print to PDF
Sample forms

No sample form available for this credit.

View all sample forms

0 commentsLeave a comment

Leave a comment Don't have an account? Create one

You must be signed in to leave a comment.