Construction activity pollution prevention | U.S. Green Building Council
USGBC.org - Scheduled Maintenance May 06th - May 07th
USGBC.org will be offline from May 06th Friday 9:00pm EST - May 07th Saturday 12:00pm EST.
Email us or call 1-800-795-1747 for assistance. Thanks for your patience.
Please upgrade your browser. This site requires a newer version to work correctly. Read more
Our "watch" feature allows you to stay current on all aspects of this specific credit. In your account, you can control what you get updated on and how you receive your notifications. Hide

LEED BD+C: Homes | v4 - LEED v4

Construction activity pollution prevention

Required

Intent

To reduce pollution from construction activities by controlling soil erosion, waterway sedimentation, and airborne dust.

Requirements

Stockpile and protect disturbed topsoil from erosion (for reuse).

Control the path and velocity of runoff with silt fencing or comparable measures.

Protect on-site storm sewer inlets, streams, and lakes with straw bales, silt fencing, silt sacks, rock filters, or comparable measures.

Provide swales to divert surface water from hillsides.

Use tiers, erosion blankets, compost blankets, filter socks, berms, or comparable measures to stabilize soils in any area with a slope of 15% (6.6:1) or more that is disturbed during construction.

Prevent air pollution from dust and particulate matter.

Construction sites larger than 1 acre must conform to the erosion and sedimentation requirements of the 2012 U.S. Environmental Protection Agency Construction General Permit or local equivalent, whichever are more stringent.

Join LEEDuser

Ask questions, share tips, and get notified of new forum posts by joining LEEDuser, a tool developed by BuildingGreen and supported by USGBC!

  • Share on Twitter
  • Share on Facebook
  • Share on LinkedIn
  • Print to PDF
Sample forms

No sample form available for this credit.

View all sample forms