Please upgrade your browser. This site requires a newer version to work correctly. Read more
Our "watch" feature allows you to stay current on all aspects of this specific credit. In your account, you can control what you get updated on and how you receive your notifications. Hide

LEED India 2011 - New Construction | v3 - LEED India 2011

Green power

EAc6 | Possible 2 points

Intent

To encourage the development and use of grid-source, renewable energy technologies on a net zero pollution basis.

Requirements

Engage in at least a 2-year renewable energy contract to provide at least 35% of the building’s electricity from renewable sources, as defined by the Center for Resource Solutions’ Green-e Energy product certification requirements. All purchases of green power shall be based on the quantity of energy consumed, not the cost. Use the annual electricity consumption from the results of EA Credit 1: Optimize Energy Performance, as a basis for the calculations in this credit.

OR
Demonstrate performance that is equivalent to the Green-e Energy National Standard requirements by substituting appropriate benchmarks, protocols and metrics for establishing a baseline, and measure performance relative to that baseline.

NOTE:

In scenarios where several projects by the same developer / owner are contracting to derive 35% of power requirements from the same green power source, the power should be separately accounted for, by separate lease contracts for every single project.

Join LEEDuser

Ask questions, share tips, and get notified of new forum posts by joining LEEDuser, a tool developed by BuildingGreen and supported by USGBC!

  • Share on Twitter
  • Share on Facebook
  • Share on LinkedIn
  • Print to PDF
Sample forms
View sample forms

0 commentsLeave a comment

Leave a comment Don't have an account? Create one

You must be signed in to leave a comment.