Wastewater management | U.S. Green Building Council
Upcoming Scheduled Maintenance for USGBC.org
USGBC.org will be offline from Friday, May 6 at 9:00 pm EST until Saturday, May 7 at 12:00 pm EST.
Email us or call 1-800-795-1747 for assistance. Thanks for your patience.
Please upgrade your browser. This site requires a newer version to work correctly. Read more
Our "watch" feature allows you to stay current on all aspects of this specific credit. In your account, you can control what you get updated on and how you receive your notifications. Hide

LEED ND: Plan | v3 - LEED 2009

Wastewater management

GIBc14 | Possible 2 points

Intent

To reduce pollution from wastewater and encourage water reuse.

Requirements

Design and construct the project to retain on-site at least 25% of the average annual wastewater generated by the project (exclusive of existing buildings), and reuse that wastewater to replace potable water. An additional point may be awarded for retaining and reusing 50%. Provide on-site treatment to a quality required by state and local regulations for the proposed reuse. The percentage of wastewater diverted and reused is calculated by determining the total wastewater flow using the design case after the GIB Prerequisite 3 calculations, and determining how much of that volume is reused on-site.

Percentage of wastewater reused Points
25% 1
50% 2

Join LEEDuser

Ask questions, share tips, and get notified of new forum posts by joining LEEDuser, a tool developed by BuildingGreen and supported by USGBC!

  • Share on Twitter
  • Share on Facebook
  • Share on LinkedIn
  • Print to PDF
Sample forms
Version: v03
Active Form Static Form
Version: v03
Active Form Static Form
Version: v03
Active Form Static Form
View all sample forms