LEED ND: Built Project | v4 - LEED v4

Smart location

Required

Intent

To encourage development within and near existing communities and public transit infrastructure. To encourage improvement and redevelopment of existing cities, suburbs, and towns while limiting the expansion of the development footprint in the region. To reduce vehicle trips and vehicle distance traveled. To reduce the incidence of obesity, heart disease, and hypertension by encouraging daily physical activity associated with walking and bicycling.

Requirements

For All Projects

Either (1) locate the project on a site served by existing water and wastewater infrastructure or (2) locate the project within a legally adopted, publicly owned, planned water and wastewater service area, and provide new water and wastewater infrastructure for the project.

The site should also meet the requirements of one of the following four options.

Option 1. Infill sites

Locate the project on an infill site.

OR

Option 2. Adjacent Sites with Connectivity

Locate the project on an adjacent site (i.e., a site that is adjacent to previously developed land) where the connectivity of the adjacent land is at least 90 intersections per square mile (35 intersections per square kilometer) as measured within a ½-mile (800-meter) distance of a continuous segment of the project boundary that constitutes at least 25% of the total project boundary and is adjacent to previous development.

Existing intersections may be counted if they were not constructed or funded by the project developer within the past 10 years.

Locate and/or design the project such that a through-connection (of the circulation network) intersects the adjacent portion of the project boundary at least every 600 feet (180 meters) on average and at least every 800 feet (245 meters), connecting it with an existing circulation network outside the project; non-motorized through-connections of the circulation network may count for no more than 20% of the total. The exemptions listed in NPDp3 Connected and Open Community do not apply to this option.

OR

Option 3. Transit corridor

Locate the project on a site with existing or planned transit service such that at least 50% of dwelling units and nonresidential use entrances (inclusive of existing buildings) are within a ¼-mile (400-meter) walking distance of bus or streetcar stops, or within a ½-mile (800-meter) walking distance of bus rapid transit stops, light or heavy rail stations, or ferry terminals, and the transit service at those stops in aggregate meets the minimums listed in Table 1.

Projects must meet the requirements for both weekday and weekend trips and provide service every day.

Table 1. Minimum daily transit service...minimum weekday and weekend trips per transit type

Weekday trips Weekend trips
Projects with multiple transit types (bus, streetcar, rail, or ferry) 60 40
Projects with commuter rail or ferry service only 24 6

If transit service is planned but not yet operational, the project must demonstrate one of the following:

  1. The relevant transit agency has a signed full-funding grant agreement with the Federal Transit Administration (or equivalent national agency for projects outside of the U.S.) that includes a revenue operations date for the start of transit service. The revenue operations date must be no later than the date by which 50% of the project’s total building gross floor area will be occupied.
  2. For bus, streetcar, bus rapid transit, or ferry service, the transit agency must certify that it has an approved budget that includes specifically allocated funds sufficient to provide the planned service at the levels listed above and that service at these levels will begin no later than the date by which 50% of the project’s total building gross floor area will be occupied.
  3. For rail service other than streetcars, the transit agency must certify that preliminary engineering for a rail line has begun. In addition, the service must meet either of these two requirements:
  • A state legislature or local subdivision of the state (or a local government for projects outside the U.S.) has authorized the transit agency to expend funds to establish rail transit service that will begin no later than the date by which 50% of the project’s total building gross floor area will be occupied.
  • Or

  • A local government has dedicated funding or reimbursement commitments from future tax revenue for the development of stations, platforms, or other rail transit infrastructure that will serve the project no later than the date by which 50% of the project’s total building gross floor area will be occupied.
  • OR

    Option 4. Sites with nearby neighborhood assets

    Include a residential component equaling at least 30% of the project’s total building gross floor area (exclusive of portions of parking structures devoted exclusively to parking) and locate the project near existing uses (see Appendix 1) such that the project boundary is within a ¼-mile (400-meter) walking distance of at least five uses, or such that the project’s geographic center is within a ½-mile (800-meter) walking distance of at least seven uses.
    The following restrictions apply.

    • A use counts as only one type (e.g., a retail store may be counted only once even if it sells products in several categories).
    • No more than two uses in each use type may be counted (e.g., if five restaurants are within the required distance, only two may be counted).
    • The uses accessible to the project must represent at least two categories.
Join LEEDuser

Ask questions, share tips, and get notified of new forum posts by joining LEEDuser, a tool developed by BuildingGreen and supported by USGBC!

  • Share on Twitter
  • Share on Facebook
  • Share on LinkedIn
  • Print to PDF
Sample forms
Version: v01
Active Form
View all sample forms

0 commentsLeave a comment

Leave a comment Don't have an account? Create one

You must be signed in to leave a comment.