Cooling tower water use | U.S. Green Building Council
Please upgrade your browser. This site requires a newer version to work correctly. Read more
Our "watch" feature allows you to stay current on all aspects of this specific credit. In your account, you can control what you get updated on and how you receive your notifications. Hide

LEED BD+C: New Construction | v4 - LEED v4

Cooling tower water use

Possible 2 points

Submittal Tips (click to expand)

WE Credit: Cooling Tower Water Use

  • Ensure that a [potable / non-potable] water analysis is performed and either a description of the methodology conducted of the results of the analysis are provided.
  • Refer to the LEED Pilot Credit Library regarding Pilot Alternative Compliance Path (ACP) options for projects with No Cooling Tower.
Balancing Water Conservation and Cooling Tower Water Needs

How to Document Cooling Tower Water Use