Enhanced commissioning

Possible 6 points

Submittal Tips (click to expand)

EA Credit: Enhanced Commissioning

Option 1. Path 1/2
  • Ensure that the commissioning documentation submitted for this credit as well as that submitted within EAp Fundamental Commissioning and Verification (i.e., commissioning plan table of contents, commissioning report summary) consistently communicate that all requirements of EAc Enhanced Commissioning are complete.
  • Be sure that the On-going Commissioning Plan addresses all required elements as indicated within the Step-by-Step guidance of the LEEDv4 BD+C Reference Guide.
Option 2. Envelope Commissioning
  • Be sure that the On-going Commissioning Plan addresses all required elements as indicated within the Step-by-Step guidance of the LEEDv4 BD+C Reference Guide.
Envelope Commissioning Case Example

Envelope Commissioning: The Essentials

BD+C Guide: Preface, Getting Started and Credit Category Overviews