Please upgrade your browser. This site requires a newer version to work correctly. Read more
Our "watch" feature allows you to stay current on all aspects of this specific credit. In your account, you can control what you get updated on and how you receive your notifications. Hide

LEED BD+C: Core and Shell | v3 - LEED 2009

Innovation: Cooling Tower Water Management

EBOM v3 WEc4.1 | Possible 1 point

Intent

To reduce potable water consumption for cooling tower or evaporative condenser equipment through effective water management and/or use of nonpotable makeup water.

Requirements

WE credit 4.1 (1 point): Chemical management

Develop and implement a water management plan for the cooling tower or evaporative condenser that addresses chemical treatment, bleed-off, biological control and staff training as it relates to cooling tower maintenance.

Improve water efficiency by installing and/or maintaining a conductivity meter and automatic controls to adjust the bleed rate and maintain proper concentration at all times.

Core and Shell Projects:

Please note that since LEED-EB is a whole building rating system, when attempting an Innovation in Design point for following a LEED-EB perquisite or credit compliance path the strategy must be applied to the entire project building. For LEED-CS projects please provide a copy of a legally binding tenant sales and lease agreement documentation that the tenants meet the requirement of the LEED-EB strategy.

Join LEEDuser

Ask questions, share tips, and get notified of new forum posts by joining LEEDuser, a tool developed by BuildingGreen and supported by USGBC!

  • Share on Twitter
  • Share on Facebook
  • Share on LinkedIn
  • Print to PDF
Sample forms

No sample form available for this credit.

View all sample forms

0 commentsLeave a comment

Leave a comment Don't have an account? Create one

You must be signed in to leave a comment.