Please upgrade your browser. This site requires a newer version to work correctly. Read more
Our "watch" feature allows you to stay current on all aspects of this specific credit. In your account, you can control what you get updated on and how you receive your notifications. Hide

| v2 - LEED 2.0

Measurement and verification

EAc5 | Possible 1 point

Intent

Provide for the ongoing accountability and optimization of building energy and water consumption performance over time.

Requirements

Comply with the long term continuous measurement of performance as stated in Option B: Methods by Technology of the US DOE’s International Performance Measurement and Verification Protocol (IPMVP) for the following:

  • Lighting systems and controls
  • Constant and variable motor loads
  • Variable frequency drive (VFD) operation
  • Chiller efficiency at variable loads (kW/ton)
  • Cooling load
  • Air and water economizer and heat recovery cycles
  • Air distribution static pressures and ventilation air volumes
  • Boiler efficiencies
  • Building specific process energy efficiency systems and equipment
  • ndoor water risers and outdoor irrigation systems.
Join LEEDuser

Ask questions, share tips, and get notified of new forum posts by joining LEEDuser, a tool developed by BuildingGreen and supported by USGBC!

  • Share on Twitter
  • Share on Facebook
  • Share on LinkedIn
  • Print to PDF
Sample forms
View sample forms

0 commentsLeave a comment

Leave a comment Don't have an account? Create one

You must be signed in to leave a comment.