System Downtime Notification
On Saturday, November 1, 2014 from 11:00 PM EST to November 2, 2014 7:00 AM EST, usgbc.org will be offline for site maintenance.
Email us or call 1-800-795-1747 for assistance. Thanks for your patience.
Please upgrade your browser. This site requires a newer version to work correctly. Read more
Our "watch" feature allows you to stay current on all aspects of this specific credit. In your account, you can control what you get updated on and how you receive your notifications. Hide

| v2 - LEED 2.0

Construction IAQ management plan - after construction

EQc3.2 | Possible 1 point

Intent

Prevent indoor air quality problems resulting from the construction/renovation process, to sustain long-term installer and occupant health and comfort.

Requirements

Develop and implement an Indoor Air Quality (IAQ) Management Plan for the preoccupancy phases of the building as follows: Conduct a minimum two-week building flush-out with new filtration media at 100% outside air after construction ends and prior to occupancy, OR conduct a baseline indoor air quality testing procedure consistent with current EPA Protocol for Environmental Requirements, Baseline IAQ and Materials, for the Research Triangle Park Campus, Section 01445.

Join LEEDuser

Ask questions, share tips, and get notified of new forum posts by joining LEEDuser, a tool developed by BuildingGreen and supported by USGBC!

  • Share on Twitter
  • Share on Facebook
  • Share on LinkedIn
  • Print to PDF
Sample forms
View sample forms

0 commentsLeave a comment

Leave a comment Don't have an account? Create one

You must be signed in to leave a comment.