System Downtime Notification
On Saturday, November 1, 2014 from 11:00 PM EST to November 2, 2014 7:00 AM EST, usgbc.org will be offline for site maintenance.
Email us or call 1-800-795-1747 for assistance. Thanks for your patience.
Please upgrade your browser. This site requires a newer version to work correctly. Read more
Our "watch" feature allows you to stay current on all aspects of this specific credit. In your account, you can control what you get updated on and how you receive your notifications. Hide

| v2 - LEED 2.1

Measurement and verification

EAc5 | Possible 1 point

Intent

Provide for the ongoing accountability and optimization of building energy and water consumption performance over time.

Requirements

Install continuous metering equipment for the following end-uses:

  • Lighting systems and controls
  • Constant and variable motor loads
  • Variable frequency drive (VFD) operation
  • Chiller efficiency at variable loads (kW/ton)
  • Cooling load
  • Air and water economizer and heat recovery cycles
  • Air distribution static pressures and ventilation air volumes
  • Boiler efficiencies
  • Building-related process energy systems and equipment
  • Indoor water risers and outdoor irrigation systems

Develop a Measurement and Verification plan that incorporates the monitoring information from the above end-uses and is consistent with Option B, C or D of the 2001 International Performance Measurement & Verification Protocol (IPMVP) Volume I: Concepts and Options for Determining Energy and Water Savings.

Join LEEDuser

Ask questions, share tips, and get notified of new forum posts by joining LEEDuser, a tool developed by BuildingGreen and supported by USGBC!

  • Share on Twitter
  • Share on Facebook
  • Share on LinkedIn
  • Print to PDF
Sample forms
View sample forms

0 commentsLeave a comment

Leave a comment Don't have an account? Create one

You must be signed in to leave a comment.