Fundamental building systems commissioning

EAp1 | Required

Intent

Verify and ensure that fundamental building elements and systems are designed, installed and calibrated to operate as intended.

Requirements

Implement or have a contract in place to implement the following fundamental best practice commissioning procedures.

  • Engage a commissioning team that does not include individuals directly responsible for project design or construction management.
  • Review the design intent and the basis of design documentation.
  • Incorporate commissioning requirements into the construction documents.
  • Develop and utilize a commissioning plan.
  • Verify installation, functional performance, training and operation and maintenance documentation.
  • Complete a commissioning report.
Join LEEDuser

Ask questions, share tips, and get notified of new forum posts by joining LEEDuser, a tool developed by BuildingGreen and supported by USGBC!

  • Share on Twitter
  • Share on Facebook
  • Share on LinkedIn
  • Print to PDF
Sample forms
View sample forms

0 commentsLeave a comment

Leave a comment Don't have an account? Create one

You must be signed in to leave a comment.