Intent
Achieve increasing levels of energy conservation beyond the referenced standard to reduce environmental impacts associated with excessive energy us
Requirements
Projects are required to achieve two (2) Optimize Energy Performance points. Project teams are awarded these two points towards LEED certification but documentation that verifies compliance with two (2) Optimize Energy Performance points is mandatory for a project to be awarded LEED
certification.
Reduce connected lighting power density below that allowed by ASHRAE/IESNA Standard 90.1-2004* using either the Space-by-Space Method or by applying the whole building lighting power allowance to the entire tenant space.
Option A. Reduce lighting power density to 15% below the standard (1 point)
OR
Option B. Reduce lighting power density to 25% below the standard, (2 points)
OR
Option C. Reduce lighting power density to 35% below the standard. (3 points)
Join LEEDuser
Ask questions, share tips, and get notified of new forum posts by joining LEEDuser, a tool developed by BuildingGreen and supported by USGBC!
0 commentsLeave a comment