Please upgrade your browser. This site requires a newer version to work correctly. Read more
Our "watch" feature allows you to stay current on all aspects of this specific credit. In your account, you can control what you get updated on and how you receive your notifications. Hide

LEED BD+C: Retail | v3 - LEED 2009

Development density and community connectivity

Possible 5 points

Intent

To channel development to urban areas with existing infrastructure, protect greenfields, and preserve habitat and natural resources. In rural areas, to increase development density on sites with existing or previously developed healthcare facilities rather than on undeveloped rural land.

Requirements

Option 1: Development density

Construct or renovate a building on a previously developed site AND in a community with a minimum density of 60,000 square feet per acre net (13,800 square meters per hectare net). The density calculation is based on a typical two-story downtown development and must include the area of the project being built.

OR

Option 2: Community connectivity

Construct or renovate a building on a site that meets the following criteria:

  • Is located on a previously developed site
  • Is within 1/2 mile (800 meters) of a residential area or neighborhood with an average density of 10 units per acre net
  • Is within 1/2 mile (800 meters) of at least 10 basic services
  • Has pedestrian access between the building and the services

For mixed-use projects, no more than 1 service within the project boundary may be counted as 1 of the 10 basic services, provided it is open to the public. No more than 2 of the 10 services required may be anticipated (i.e. at least 8 must be existing and operational). In addition, the anticipated services must demonstrate that they will be operational in the locations indicated within 1 year of occupation of the applicant project. Examples of basic services include the following:

  • Bank
  • Place of Worship
  • Convenience Grocery
  • Day Care Center
  • Cleaners
  • Fire Station
  • Beauty Salon
  • Hardware
  • Laundry
  • Library
  • Medical or Dental Office
  • Senior Care Facility
  • Park
  • Pharmacy
  • Post Office
  • Restaurant
  • School
  • Supermarket
  • Theater
  • Community Center
  • Fitness Center
  • Museum

Proximity is determined by drawing a 1/2-mile (800 meter) radius around a main building entrance on a site map and counting the services within that radius.

Greenfield developments and projects that do not use existing infrastructure are not eligible.

Join LEEDuser

Ask questions, share tips, and get notified of new forum posts by joining LEEDuser, a tool developed by BuildingGreen and supported by USGBC!

  • Share on Twitter
  • Share on Facebook
  • Share on LinkedIn
  • Print to PDF
Sample forms
Version: v03
Active Form Static Form
Version: v04
Active Form Static Form
View all sample forms

0 commentsLeave a comment

Leave a comment Don't have an account? Create one

You must be signed in to leave a comment.