Am I allowed to use the guidance provided in the AGMBC document to certify my LEED CS Pre-Certification projects?
Answer
Yes. The AGMBC guidance is applicable to LEED CS Pre-certification Projects. However, master sites can’t be used help document the pre-certification phases of Core and Shell projects.
Also see
- With the launch of LEED Online for Campus, what will happen with my individual building/space campus projects that are in LEED Online v3?
- Can I transfer my campus project from LEED Online v3 to LEED Online for Campus?
- Can I transfer individual building registrations from LEED Online v3 to a Group Project registration in LEED Online for Campus?
- I have a Master Site that has gone through review in LEED Online v3. Can I register campus projects in LEED Online for Campus that utilize credits that were preapproved in the Master Site?
- Can I certify projects other than Campus projects in LEED Online for Campus?
- How are project teams set up in LEED Online for Campus and how is this different from LEED Online v3?
- In LEED Online v3, I organized my campus projects in a block. How are projects organized in LEED Online for Campus?
- Are the registration and/or certification fees different in LEED Online for Campus than they are in LEED Online v3?
- How can I certify my campus?
- Can I use the options outlined in the 2005 LEED-NC Application Guide for Multiple Buildings and On-Campus Building Projects (AGMBC 2005) for my LEED 2009 Project?
- Can I reference campus credits documented in the master site during a LEED Pre-Certification phase for a LEED CS Certification project?
- If I registered individual LEED 2009 projects before the release of the group certification functionality (formerly Part 2) in the AGMBC, can I use those registrations to register a project for group certification?
- The AGMBC guidance requires a list of the registered projects to which the campus credits will apply. What if I am unable to register all projects pursuing LEED certification at the time of master site review submittal?
- How is the LEED campus boundary different from the LEED project boundary?
- Can I exclude buildings from my LEED campus boundary?
Have a question or comment?
(within U.S.)
(outside U.S.)
M-F 9:00 AM to 5:30 PM EST
Billing
U.S. Green Building Council
P.O. Box 404296
Atlanta, GA 30384-4296
Location
2101 L Street, NW
Suite 500
Washington DC 20037
Map