Entry Type ID Date Applicable Rating System Primary Credit Inquiry (LIs) Ruling (LIs) Related Addenda/LIs Related Resources Campus Applicable Internationally Applicable Country Applicability Reference Guide (Addenda) Page (Addenda) Location (Addenda) Description of Change (Addenda) "Reference Guide Correction" "100001176" "2012-04-01" "Commercial Interiors, Retail - Commercial Interiors" "EAc4 - Green power" "100001177" "None" "Green Interior Design and Construction, 2009 edition$Green Interior Design and Construction, 2009 edition, updated June 2011" "ID+C RG: 200" "6. Calculations" "After the first sentence, add the following: ""If an energy model was used to document compliance with EAc1.3: Optimize Energy Performance, HVAC, the data from the energy model must be used as the basis for determining the electricity consumption for this credit.""" "Reference Guide Correction" "100000886" "2011-05-09" "Commercial Interiors, Retail - Commercial Interiors" "EAc4 - Green power" "None" "None" "Green Interior Design and Construction, 2009 edition" "ID+C RG: 199" "4. Implementation" "In item 3, remove the text ""If Green-e-certified power cannot be purchased through a local utility"" " "Reference Guide Correction" "100000879" "2011-05-09" "Retail - Commercial Interiors" "EAc4 - Green power" "None" "None" "Retail Supplement to Green Interior Design and Construction, 2009 edition" "Retail-CI RG supp: 61" "Table below credit title" "Change points from 5 to 2" "Global ACP" "100001493" "2012-10-01" "Commercial Interiors, Retail - Commercial Interiors" "EAc4 - Green power" "None" "None" "X" "Green Interior Design and Construction, 2009 edition $ Green Interior Design and Construction, 2009 edition, updated June 2011 $ Retail Supplement to Green Interior Design and Construction, 2009 edition" "CI RS 25, Retail CI RS 25" "Option 1" "Add ""or an equivalent"" to the end of the first sentence." "Global ACP" "100001494" "2012-10-01" "Commercial Interiors, Retail - Commercial Interiors" "EAc4 - Green power" "None" "None" "X" "Green Interior Design and Construction, 2009 edition $ Green Interior Design and Construction, 2009 edition, updated June 2011 $ Retail Supplement to Green Interior Design and Construction, 2009 edition" "CI RS 25, Retail CI RS 25" "Option 1" "Add the following after the second paragraph: ""If the green power is not Green-e Energy certified, equivalence must exist for both major Green-e Energy program criteria: 1) current green power performance standards, and 2) independent, third-party verification that those standards are being met by the green power supplier over time.""" "Global ACP" "100001495" "2012-10-01" "Commercial Interiors, Retail - Commercial Interiors" "EAc4 - Green power" "None" "None" "X" "Green Interior Design and Construction, 2009 edition $ Green Interior Design and Construction, 2009 edition, updated June 2011 $ Retail Supplement to Green Interior Design and Construction, 2009 edition" "CI RS 25, Retail CI RS 25" "Option 2" "Add ""or an equivalent"" to the end of the first sentence." "Global ACP" "100001496" "2012-10-01" "Commercial Interiors, Retail - Commercial Interiors" "EAc4 - Green power" "None" "None" "X" "Green Interior Design and Construction, 2009 edition $ Green Interior Design and Construction, 2009 edition, updated June 2011 $ Retail Supplement to Green Interior Design and Construction, 2009 edition" "CI RS 25, Retail CI RS 25" "Option 2" "Add the following after the second paragraph: ""If the green power is not Green-e Energy certified, equivalence must exist for both major Green-e Energy program criteria: 1) current green power performance standards, and 2) independent, third-party verification that those standards are being met by the green power supplier over time.""" "LEED Interpretation" "10126" "2011-11-01" "New Construction, Core and Shell, Schools - New Construction, Retail - New Construction, Healthcare, Hospitality - New Construction, Commercial Interiors, Retail - Commercial Interiors, Existing Buildings, Schools - Existing Buildings, Retail - Existing Buildings" "EAc2.1-2.3 - Renewable energy" "The LEED EB:O&M Reference Guide does not specify precisely when during the LEED application review process Renewable Energy Credits (RECs) must be purchased, it only requires that the RECs meet specific percentages of the building\'s total energy use from the performance period.\n\nOur project team would like to wait until after the final review to file an appeal in order to purchase RECs and have EAc4 points included in the project\'s total before accepting certification.\n\nCan EAc4 thresholds be met by RECs purchased after the final review when filed through the appeal process?" "A project team may elect to add and pursue EA c4 as part of an appeal after the project building\'s performance period has ended and after the Final Review has been completed and purchase RECs at that time, as long as the RECs purchased are based on the total annual site energy usage value reported for EAp2 and are allocated to the project building only. Note that at the time of appeal submittal, the project must have entered into a contract or commitment for future purchases to meet the 2-year requirement. Applicable internationally." "400013061/400012752 BDC - Directed Purchase, 400013061/400012752 IDC - Directed Purchase, 10389" "None" "X" "LEED Interpretation" "10162" "2012-04-01" "New Construction, Core and Shell, Schools - New Construction, Retail - New Construction, Healthcare, Data centers - New Construction, Hospitality - New Construction, Commercial Interiors, Retail - Commercial Interiors" "EAc6 - Green power" "If a project receives an allotment of REC credits from a larger corporation in the required amount and states that the REC credits will not be counted towards or used for any other project within the corporation`s portfolio, will this meet the credit requirements? If yes, what if any additional submittal requirements are necessary to illustrate the intent of the credit has been met?" "The project is requesting that REC\'s purchased from a larger corporation meet the credit requirements on a single project. Yes, this approach is acceptable given that the project has purchased Green-e accredited Tradable Renewable Certificates (RECs) equal to at least 35% (or 50% for LEED-CI projects) of the predicted annual electrical consumption for the project building over a 2-year period. In addition to the standard submittal requirements, a statement in the form of an email or letter from the building portfolio owner should be provided confirming that that the REC credits will not be counted towards or used for any other project within the corporation`s portfolio." "None" "None" "LEED Interpretation" "10219" "2012-07-01" "New Construction, Core and Shell, Schools - New Construction, Retail - Commercial Interiors, Healthcare" "EAc6 - Green power" "Regarding LEED BD&C EAc6: As the cost of renewable energy sources (PV, in particular) continues to drop, the number of projects able to pursue a site net zero energy goal will continue to increase. The final estimation of electricity consumption for EAc1, Optimize Energy Performance, includes the impact of renewable energy determined through EAc2, On-Site Renewable Energy. The credit language for EAc6 indicates that the annual electricity consumption is to be determined from the results of EAc1 or CBECS. Based on this language, it would appear that a net zero energy project would not need to purchase any renewable energy credits (i.e. green power) to achieve EAc6. If a project was 99% better than ASHRAE 90.1-2007 as determined for EAc1, the green power purchase required would be clear, albeit very small. EAc6 seems to conflict with facilities wanting to increase their energy performance to net zero. Please clarify this credit to support projects seeking net zero. " "The applicant is asking whether EA Credit 6 - Green Power, and by extension, EAc6 exemplary performance, may be automatically awarded for projects that are designed to be net-zero in terms of average annual energy use without the purchase of green power or renewable energy credits. \nYes. If the project produces 100% or more of its electricity as on-site generated renewable electricity, as documented in EAc2 - On-site Renewable Energy, the project is eligible to earn EAc6 and one Innovation in Design point for Exemplary Performance in Green Power. However, for any project that is connected to the electric utility grid, the following requirements apply to ensure that the project meets the credit intent if the project does not achieve net-zero performance once built:\n1. If a Green-e certified or equivalent utility program is available to the project in the project location, then the project team must provide a 2-year contract or Owner\'s letter of Commitment indicating that the project will commit to a 2-year enrollment period in the program for at least 35% of the provided electrical energy for EA Credit 6, or 70% of the provided electrical energy for Exemplary Performance in Green Power.\n2. If a Green-e certified or equivalent utility program is not available to the project in the project location, then the project team must provide a letter of commitment signed by the Owner or Owner\'s representative confirming:\na. That a Green-e certified or equivalent utility program is not available to the project.\nb. That the project will review the purchased annual energy consumption for the first two years of occupancy, and will commit to purchase RECs to offset 35% of the purchased electrical consumption for EA Credit 6, or 70% of the provided electrical consumption for Exemplary Performance in Green Power. " "None" "None" "Rating System Correction" "100001793" "2013-10-01" "Commercial Interiors, Retail - Commercial Interiors" "EAc4 - Green power" "None" "None" "X" "Green Interior Design and Construction, 2009 edition, $ Green Interior Design and Construction, 2009 edition, updated June 2011, $ Retail Supplement to Green Interior Design and Construction, 2009 edition" "CI RS: 25, $ Retail CI RS: 23, $ IDC RG 1st ed: 197, $ IDC RG 2nd ed: 197, $ Retail CI RG Supplement: 61" "Requirements- Option 2" "Revise the metric conversion in the first paragraph to:\n “8 kilowatt hours per square foot per year (86.1 kilowatt hours per square meter per year)”" "Regional ACP" "100001974" "2014-10-01" "New Construction, Core and Shell, Schools - New Construction, Retail - New Construction, Healthcare, Commercial Interiors, Retail - Commercial Interiors" "EAc6 - Green power" "None" "None" "Europe" "Green Building Design and Construction, 2009 edition" "BD+C RG 2nd ed: 325" "Requirements" "Projects in Europe may use the following approved standards in place of Green-e Energy: "