Please upgrade your browser. This site requires a newer version to work correctly. Read more
Our "watch" feature allows you to stay current on all aspects of this specific credit. In your account, you can control what you get updated on and how you receive your notifications. Hide

LEED BD+C: New Construction | v2.1

Fundamental building systems commissioning

EAp1 | Required

Intent

Verify and ensure that fundamental building elements and systems are designed, installed and calibrated to operate as intended.

Requirements

Implement or have a contract in place to implement the following fundamental best practice commissioning procedures.

  • Engage a commissioning team that does not include individuals directly responsible for project design or construction management.
  • Review the design intent and the basis of design documentation.
  • Incorporate commissioning requirements into the construction documents.
  • Develop and utilize a commissioning plan.
  • Verify installation, functional performance, training and operation and maintenance documentation.
  • Complete a commissioning report.
Join LEEDuser

Ask questions, share tips, and get notified of new forum posts by joining LEEDuser, a tool developed by BuildingGreen and supported by USGBC!

  • Share on Twitter
  • Share on Facebook
  • Share on LinkedIn
  • Print to PDF
Sample forms
View sample forms

0 commentsLeave a comment

Leave a comment Don't have an account? Create one

You must be signed in to leave a comment.