Intent
To provide for the ongoing accountability of building energy consumption over time.
Requirements
Whole building design and construction projects must use actual and predicted wholebuilding energy consumption to meet the requirements below.
Core and shell design and construction projects must use actual and predicted basebuilding energy consumption to meet the requirements below.
Develop and implement a Measurement & Verification (M&V) program in accordance with Option D: Calibrated Simulation (either Savings Estimation Method 1 or 2), as specified by the International Performance Measurement and Verification Protocol (IPMVP), Concepts and Options for Determining Energy Savings in New Construction, Volume III, 2006.
The M&V period must cover at least one year of post-construction occupancy.
An executed contract(s) must be in place for all services necessary to execute the M&V program, including the eventual submittal of the final M&V report to the project team and building owner, including
- Reconciliation between actual energy use and energy use predicted by EA Credit 1.
- Discussion of reconciliation and variances between actual energy use and energy use predicted by EA Credit 1.
- Actual avoided energy use compared to the EA Credit 1 baseline.
- Avoided energy costs compared to the EA Credit 1 baseline.
- Avoided GHG emissions compared to the EA Credit 1 baseline.
- Recommendations for any remedial or future action.
Projects that are connected to district energy systems must follow LEED’s DES requirements.