Please upgrade your browser. This site requires a newer version to work correctly. Read more
Our "watch" feature allows you to stay current on all aspects of this specific credit. In your account, you can control what you get updated on and how you receive your notifications. Hide

Commercial Interiors | v2009

Reconcile projected and actual energy performance

EApc27 | Possible 1 point

Intent

To provide for the ongoing accountability of building energy consumption over time.

Requirements

Develop and implement a tenant-level Measurement & Verification (M&V) program in accordance with Option D: Calibrated Simulation (either Savings Estimation Method 1 or 2), as specified by the International Performance Measurement and Verification Protocol (IPMVP), Concepts and Options for Determining Energy Savings in New Construction, Volume III, 2006.

The M&V period must cover at least one year of post-construction occupancy.

An executed contract(s) must be in place for all services necessary to execute the M&V program, including the eventual submittal of the final M&V report to the project team and building owner, including:

  • Reconciliation between actual tenant energy use and tenant energy use predicted by EA Credit 1.
  • Discussion of reconciliation and variances between actual tenant energy use and tenant energy use predicted by EA Credit 1.
  • Actual avoided tenant energy use compared to the EA Credit 1 baseline.
  • Avoided tenant energy costs compared to the EA Credit 1 baseline.
  • Avoided tenant GHG emissions compared to the EA Credit 1 baseline.
  • Recommendations for any remedial or future action.
Join LEEDuser

Ask questions, share tips, and get notified of new forum posts by joining LEEDuser, a tool developed by BuildingGreen and supported by USGBC!

  • Share on Twitter
  • Share on Facebook
  • Share on LinkedIn
  • Send to a friend
  • Print to PDF
Sample forms

No sample form available for this credit.

View all sample forms

0 commentsLeave a comment

Leave a comment Don't have an account? Create one

You must be signed in to leave a comment.

Give feedback

How do you feel about this page?