Intent
To provide for the ongoing accountability of building energy consumption over time.
Requirements
Develop and implement a tenant-level Measurement & Verification (M&V) program in accordance with Option D: Calibrated Simulation (either Savings Estimation Method 1 or 2), as specified by the International Performance Measurement and Verification Protocol (IPMVP), Concepts and Options for Determining Energy Savings in New Construction, Volume III, 2006.
The M&V period must cover at least one year of post-construction occupancy.
An executed contract(s) must be in place for all services necessary to execute the M&V program, including the eventual submittal of the final M&V report to the project team and building owner, including:
- Reconciliation between actual tenant energy use and tenant energy use predicted by EA Credit 1.
- Discussion of reconciliation and variances between actual tenant energy use and tenant energy use predicted by EA Credit 1.
- Actual avoided tenant energy use compared to the EA Credit 1 baseline.
- Avoided tenant energy costs compared to the EA Credit 1 baseline.
- Avoided tenant GHG emissions compared to the EA Credit 1 baseline.
- Recommendations for any remedial or future action.
Join LEEDuser
Ask questions, share tips, and get notified of new forum posts by joining LEEDuser, a tool developed by BuildingGreen and supported by USGBC!
0 commentsLeave a comment