Pilot credit

Advanced utility tracking

EApc38 | Possible 1 point

Intent

To provide advanced monitoring and reconciliation of energy and water use at the whole building and end use levels. To provide for the ongoing accountability of building utility consumption over time.

Requirements

Case 1. Single family
Option 1: Energy and water
  1. Install an advanced energy monitoring system that meets the following requirements:
    • Meters must be permanently installed,
    • Record at intervals of 1 hour or less
    • Transmit data to the homeowner or occupant at a remote location (e.g, computer, in house display).
    • Separate energy usage information for at least four end uses such as space conditioning, water heating, and major plug loads.
  2. Irrigation Meter. If an automatic in-ground irrigation system is part of the home project and the landscape irrigated area is larger than 1000 square feet, a sub-meter must be installed to monitor all irrigation system components.
AND/OR
Option 2. Building Performance Partnership

Homeowner must enroll in the USGBC Building Performance Partnership (BPP) for all applicable utility accounts, prior to submitting for LEED Certification/

Case 2. Multi-family
Option 1. Energy and water
  1. Install an advanced energy monitoring system for each unit that meets the following requirements:
    • Meters must be permanently installed,
    • Record at intervals of 1 hour or less
    • Transmit data to the homeowner or occupant at a remote location (e.g, computer, in house display).
    • Separate energy usage information for at least four end uses such as space conditioning, water heating, and major plug loads.
  2. Irrigation Meter. If an automatic in-ground irrigation system is part of the home project and the landscape irrigated area is larger than 1000 square feet, a sub-meter must be installed to monitor all irrigation system components.
AND/OR
Option 2. Building Performance Partnership
Path 1: Whole-building master meter

Building owner must enroll in the USGBC Building Performance Partnership (BPP) for all applicable utility accounts, prior to submitting for LEED Certification.

OR
Path 2. Individual unit meters

At least 50% of unit owners or occupants must enroll in the USGBC Building Performance Partnership (BPP) for all applicable utility accounts, prior to submitting for LEED Certification.

Join LEEDuser

Ask questions, share tips, and get notified of new forum posts by joining LEEDuser, a tool developed by BuildingGreen and supported by USGBC!

  • Share on Twitter
  • Share on Facebook
  • Share on LinkedIn
  • Print to PDF
Sample forms
View sample forms

0 commentsLeave a comment

Leave a comment Don't have an account? Create one

You must be signed in to leave a comment.