Please upgrade your browser. This site requires a newer version to work correctly. Read more
Our "watch" feature allows you to stay current on all aspects of this specific credit. In your account, you can control what you get updated on and how you receive your notifications. Hide

LEED ND: Project | v4

Construction activity pollution prevention

Required

Intent

To reduce pollution from construction activities by controlling soil erosion, waterway sedimentation, and airborne dust.

Requirements

Create and implement an erosion and sedimentation control plan for all new construction activities associated with the project. The plan must incorporate best management practices (BMPs) to control erosion and sedimentation in runoff from the entire project site during construction. The BMPs must be selected from EPA’s BMPs for construction and post-construction site runoff control.

The erosion and sedimentation control plan must list the BMPs employed and describe how the project team will do the following:

  • preserve vegetation and mark clearing limits;
  • establish and delineate construction access;
  • control flow rates;
  • install sediment controls;
  • stabilize soils;
  • prevent soil loss during construction;
  • stockpile topsoil for reuse;
  • protect slopes;
  • protect drain inlets, all rainwater conveyance systems, and receiving water bodies;
  • stabilize channels and outlets;
  • control pollutants including dust and particulate matter;
  • control dewatering;
  • maintain the BMPs; and
  • manage the erosion and sedimentation control plan.
Join LEEDuser

Ask questions, share tips, and get notified of new forum posts by joining LEEDuser, a tool developed by BuildingGreen and supported by USGBC!

  • Share on Twitter
  • Share on Facebook
  • Share on LinkedIn
  • Print to PDF
Sample forms

No sample form available for this credit.

View all sample forms

0 commentsLeave a comment

Leave a comment Don't have an account? Create one

You must be signed in to leave a comment.