Intent
To reduce the environmental harms from energy used for operating public infrastructure.
Requirements
Design, purchase, or work with the municipality to install all new infrastructure (e.g., traffic lights, street lights, water and wastewater pumps) to achieve a 15% annual energy reduction below an estimated baseline energy use for this infrastructure. When determining the baseline, assume the use of lowest first-cost infrastructure items.
Join LEEDuser
Ask questions, share tips, and get notified of new forum posts by joining LEEDuser, a tool developed by BuildingGreen and supported by USGBC!
0 commentsLeave a comment