Please upgrade your browser. This site requires a newer version to work correctly. Read more
Our "watch" feature allows you to stay current on all aspects of this specific credit. In your account, you can control what you get updated on and how you receive your notifications. Hide

LEED ID+C: Retail | v1.0 pilot

Optimize energy performance, lighting controls

EAc1.2 | Possible 1 point

Intent

Achieve increasing levels of energy conservation beyond the prerequisite standard to reduce environmental impacts associated with excessive energy use.

Requirements

Projects are required to achieve two (2) Optimize Energy Performance points. Project teams are awarded these two points towards LEED certification but documentation that verifies compliance with two (2) Optimize Energy Performance points is mandatory for a project to be awarded LEED certification.

Install daylight responsive controls in all regularly occupied spaces within 15 feet of windows and under skylights.

Join LEEDuser

Ask questions, share tips, and get notified of new forum posts by joining LEEDuser, a tool developed by BuildingGreen and supported by USGBC!

  • Share on Twitter
  • Share on Facebook
  • Share on LinkedIn
  • Print to PDF
Sample forms
View sample forms

0 commentsLeave a comment

Leave a comment Don't have an account? Create one

You must be signed in to leave a comment.