Please upgrade your browser. This site requires a newer version to work correctly. Read more

LEED ND: Built Project v3 - LEED 2009

DHA Mariposa Mixed-Use Development

1099 Osage St.
Denver, CO 80204
United States
Map

LEED Gold 2015

LEED Scorecard

Gold 62/110

  • SLLc1

    Preferred locations 5 / 10
  • SLLc2

    Brownfields redevelopment 1 / 2
  • SLLc3

    Locations with reduced automobile dependence 7 / 7
  • SLLc4

    Bicycle network and storage 1 / 1
  • SLLc5

    Housing and jobs proximity 0 / 3
  • SLLc6

    Steep slope protection 0 / 1
  • SLLc7

    Site design for habitat or wetland and water body conservation 1 / 1
  • SLLc8

    Restoration of habitat or wetlands and water bodies 0 / 1
  • SLLc9

    Long-term conservation management of habitat or wetlands and water bod... 0 / 1
  • GIBc1

    Certified green buildings 5 / 5
  • GIBc10

    Solar orientation 0 / 1
  • GIBc11

    On-site renewable energy sources 2 / 3
  • GIBc12

    District heating and cooling 0 / 2
  • GIBc13

    Infrastructure energy efficiency 0 / 1
  • GIBc14

    Wastewater management 0 / 2
  • GIBc15

    Recycled content in infrastructure 0 / 1
  • GIBc16

    Solid waste management infrastructure 0 / 1
  • GIBc17

    Light pollution reduction 0 / 1
  • GIBc2

    Building energy efficiency 0 / 2
  • GIBc3

    Building water efficiency 1 / 1
  • GIBc4

    Water efficient landscaping 0 / 1
  • GIBc5

    Existing building reuse 0 / 1
  • GIBc6

    Historic resource preservation and adaptive use 0 / 1
  • GIBc7

    Minimized site disturbance in design and construction 0 / 1
  • GIBc8

    Stormwater management 4 / 4
  • GIBc9

    Heat island reduction 1 / 1
  • IDc1

    Innovation and exemplary performance + 1
  • IDc2

    LEED Accredited Professional + 1
  • Share on Twitter
  • Share on Facebook
  • Share on LinkedIn
  • Print

LEED Facts

for LEED ND: Built Project (v2009)

Certification awarded Jan 2015

Gold
62
Smart location and linkage
15/27
ND pattern & design
30/44
Green Infrastructure & bldgs
13/29
Innovation
2/6
Regional priority credits
2/4