Please upgrade your browser. This site requires a newer version to work correctly. Read more

LEED BD+C: New Construction v2 - LEED 2.2

UT BME South Expansion

107 West Dean Keeton
Austin, TX 78712
United States
Map

LEED Gold 2013

LEED Scorecard

Gold 39/69

  • SSc1

    Site selection 1 / 1
  • SSc2

    Development density and community connectivity 1 / 1
  • SSc3

    Brownfield redevelopment 0 / 1
  • SSc4.1

    Alternative transportation - public transportation access 1 / 1
  • SSc4.2

    Alternative transportation - bicycle storage and changing rooms 1 / 1
  • SSc4.3

    Alternative transportation - low emitting and fuel efficient vehicles 0 / 1
  • SSc4.4

    Alternative transportation - parking capacity 1 / 1
  • SSc5.1

    Site development - protect or restore habitat 0 / 1
  • SSc5.2

    Site development - maximize open space 0 / 1
  • SSc6.1

    Stormwater design - quantity control 0 / 1
  • SSc6.2

    Stormwater design - quality control 0 / 1
  • SSc7.1

    Heat island effect - non-roof 1 / 1
  • SSc7.2

    Heat island effect - roof 0 / 1
  • SSc8

    Light pollution reduction 0 / 1
  • WEc1.1

    Water efficient landscaping - reduce by 50% 1 / 1
  • WEc1.2

    Water efficient landscaping - no potable water use or no irrigation 1 / 1
  • WEc2

    Innovative wastewater technologies 0 / 1
  • WEc3.1

    Water use reduction - 20% reduction 1 / 1
  • WEc3.2

    Water use reduction - 30% reduction 1 / 1
  • EAc1

    Optimize energy performance 6 / 10
  • EAc2

    On-site renewable energy 0 / 3
  • EAc3

    Enhanced commissioning 1 / 1
  • EAc4

    Enhanced refrigerant management 0 / 1
  • EAc5

    Measurement and verification 0 / 1
  • EAc6

    Green power 0 / 1
  • MRc1.1

    Building reuse - maintain 75% of existing walls, floors & roof 0 / 1
  • MRc1.2

    Building reuse - maintain 95% of existing walls, floors & roof 0 / 1
  • MRc1.3

    Building reuse - maintain 50% of interior non-structural elements 0 / 1
  • MRc2.1

    Construction waste management - divert 50% from disposal 1 / 1
  • MRc2.2

    Construction waste management - divert 75% from disposal 1 / 1
  • MRc3.1

    Materials reuse - 5% 0 / 1
  • MRc3.2

    Materials reuse - 10% 0 / 1
  • MRc4.1

    Recycled content - 10% (post-consumer + 1/2 pre-consumer) 2 / 1
  • MRc4.2

    Recycled content - 20% (post-consumer + 1/2 pre-consumer) 0 / 1
  • MRc5.1

    Regional materials - 10% extracted, processed and manufactured regiona... 1 / 1
  • MRc5.2

    Regional materials - 20% extracted, processed and manufactured regiona... 1 / 1
  • MRc6

    Rapidly renewable materials 0 / 1
  • MRc7

    Certified wood 1 / 1
  • EQc1

    Outdoor air delivery monitoring 1 / 1
  • EQc2

    Increased ventilation 1 / 1
  • EQc3.1

    Construction IAQ management plan - during construction 1 / 1
  • EQc3.2

    Construction IAQ management plan - before occupancy 0 / 1
  • EQc4.1

    Low-emitting materials - adhesives and sealants 1 / 1
  • EQc4.2

    Low-emitting materials - paints and coatings 1 / 1
  • EQc4.3

    Low-emitting materials - carpet systems 1 / 1
  • EQc4.4

    Low-emitting materials - composite wood and agrifiber products 1 / 1
  • EQc5

    Indoor chemical and pollutant source control 1 / 1
  • EQc6.1

    Controllability of systems - lighting 1 / 1
  • EQc6.2

    Controllability of systems - thermal comfort 0 / 1
  • EQc7.1

    Thermal comfort - design 1 / 1
  • EQc7.2

    Thermal comfort - verification 1 / 1
  • EQc8.1

    Daylight and views - daylight 75% of spaces 0 / 1
  • EQc8.2

    Daylight and views - views for 90% of spaces 0 / 1
  • IDc1

    Innovation in design + 3
  • IDc2

    LEED Accredited Professional + 1
  • Share on Twitter
  • Share on Facebook
  • Share on LinkedIn
  • Print

LEED Facts

for LEED BD+C: New Construction (v2.2)

Certification awarded Jun 2013

Gold
39
Sustainable sites
6/14
Water efficiency
4/5
Energy & atmosphere
7/17
Material & resources
7/13
Indoor environmental quality
11/15
Innovation
4/5