Advanced Customer Technology Test for Maximum Energy Efficiency (ACT2) Project: The Final Report

This project showed that an integrated design approach results in 40-50% energy savings for retrofit projects and 55–65% energy reduction for new construction sites.
PDF

This experimental project run by Pacific Gas and Electric Company (PG&E) showed that an integrated design approach results in 40-50% energy savings for retrofit projects and 55–65% energy reduction for new construction sites.

Case Study (12 Pages)
Authored By: Lance E. Elberling, Grant J Brohard, Ralph Cavanagh, George R. Hernandez, Amory Lovins, Arthur H. Rosenfeld
Published On: 1 Jan 1998