Please upgrade your browser. This site requires a newer version to work correctly. Read more

Liberty Centre: Case Study

Price $15.00 (member price is $10.00)
Format
Type Case studies
Published by U.S. Green Building Council
Published on 1 Jan 2010

Preparing for a LEED Professional Credential?

Take a look inside the LEED project planning process, from registration to certification, while earning credential maintenance hours with LEED Stories from Practice.

The Liberty Centre: Case Study details the story of the 17-story existing office building in Portland, Ore. which houses a variety of tenants and is easily accessible by public transit. By providing educational information to tenants regarding the environmental features of the building, Liberty Centre aims to encourage its tenants to make sustainable business choices.

Learn how their project team accomplished a return on investment that includes an 11% reduction in total energy consumption and a nearly 95% tenant retention rate.

0
  • Share on Twitter
  • Share on Facebook
  • Share on LinkedIn
  • Print

Kenyon House: Case Study

Learn how employing an integrative approach enabled the success of an affordable housing project team that pursued LEED late in the design process, and earn credential maintenance hours.

Chartwell School: Case Study

This case study, on the first-ever LEED Platinum school, brings to life the visioning, design, construction, and operation of Chartwell School, located in Seaside California.

Biodesign Institute at Arizona State University: Case Study

From the series LEED Stories from Practice, read about lessons learned from a real LEED project using the New Construction v2.2 rating system.

One and Two Potomac Yard: Case Study

Learn how one project team addressed a LEED learning curve for every single one of its subcontractors by focusing on critical credits and coming out on top with two LEED certifications, and earn credential maintenance hours.