System Downtime Notification
From Saturday, August 30, 2014 from 8:00 am EST to 11:59 pm EST, usgbc.org will be offline for site maintenance.
Email us or call 1-800-795-1747 for assistance. Thanks for your patience.
Please upgrade your browser. This site requires a newer version to work correctly. Read more

Process Efficiency Measures--Options 2 and 3--Nov 17 2010--for Windows 2007

Format Excel doc
Type Calculators
Published on 23 May 2013
Effective on 15 Nov 2010

"This worksheet must be completed for projects pursuing EA Credit 1 Option 2 or Option 3 if the project scope includes any relevant equipment from Tables 1 - 4 in the Retail-NC Rating System, EA Credit 1. These tables apply to commercial kitchen equipment (Table 1), supermarket refrigeration equipment (Table 2), walk-in coolers or freezers (Table 3), and commercial kitchen ventilation (Table 4). If prescriptive criteria has been met for all applicable equipment in the building, then the energy consumption for the equipment does NOT need to be reported. However, if there is any equipment in the building where the prescriptive criteria has not been met, the energy consumption for each piece of equipment must be calculated using either the Table 1 Default Method (for Table 1), manufacturer's data, or supplemental calculations.
"


0
  • Share on Twitter
  • Share on Facebook
  • Share on LinkedIn
  • Print