Cooling tower cycles Points (except data centers) Points (data centers)
Maximum number of cycles achieved without exceeding any filtration levels or affecting operation of condenser water system (up to maximum of 10 cycles) 2

2

Achieve a minimum 10 cycles by increasing the level of treatment in condenser or make-up water
OR
Achieve the number of cycles for 1 point and use a minimum 20% recycled nonpotable water
3

4