Please upgrade your browser. This site requires a newer version to work correctly. Read more

WEc v4 cooling tower points table EB

ID EBv4_WEc_CoolingTowerTable2
Type Tables
Shared by Batya Metalitz
Cooling tower cycles Points (except data centers) Points (data centers)
Maximum number of cycles achieved without exceeding any filtration levels or affecting operation of condenser water system (up to maximum of 10 cycles) 2

2

Achieve a minimum 10 cycles by increasing the level of treatment in condenser or make-up water
OR
Achieve the number of cycles for 1 point and use a minimum 20% recycled nonpotable water
3

4


0
  • Share on Twitter
  • Share on Facebook
  • Share on LinkedIn
  • Print