LEED Online - Scheduled Maintenance
From Friday, April 17, 9:00 PM to Saturday, April 18, 9:00 PM EST, LEED Online will be offline for site maintenance.
Email us or call 1-800-795-1747 for assistance. Thanks for your patience.
Please upgrade your browser. This site requires a newer version to work correctly. Read more

WEc v4 cooling tower points table EB

Cooling tower cycles Points (except data centers) Points (data centers)
Maximum number of cycles achieved without exceeding any filtration levels or affecting operation of condenser water system (up to maximum of 10 cycles) 2

2

Achieve a minimum 10 cycles by increasing the level of treatment in condenser or make-up water
OR
Achieve the number of cycles for 1 point and use a minimum 20% recycled nonpotable water
3

4

ID: EBv4_WEc_CoolingTowerTable2