Accessibility Tools

  • Increase text
  • Decrease text
  • High contrast
  • Negative contrast
  • Add grayscale
  • Remove grayscale
  • Add lightbackground
  • Remove lightbackground
  • Reset

Practically Perfect Plumbing Part 2

See some new information, review a hands-on demo and get your project reviewed
Published:
GBCI: 0920026875
Continuing education: 1 CE
AIA credit: 1 LU/HSW
Completions: 351

Objectives

  1. Identify more design strategies you did not know about (hot) water and LEED v4 Homes BD+C EA efficient hot water distribution
  2. Understand the pressure drops, how and why they occur and how it connects with LEED v4 Homes BD+C EA efficient hot water distribution
  3. Verify that the amount of water, energy and time it takes for hot water to arrive at a fixture is significantly larger than the volume that is in the pipe and how this connects with LEED v4 Homes BD+C EA efficient hot water distribution
  4. Compare the pressure drop through modern fittings with the values in our engineering tables and how it releases to LEED v4 Homes BD+C EA efficient hot water distribution

Leaders

Gary Klein

Comments

No comments yetLeave a comment


Logging out the application..