Rating System
LEED BD+C: New Construction, LEED O+M: Existing Buildings, LEED BD+C: Core and Shell, LEED BD+C: Schools
Rating System Version
v3 - LEED 2009, v3 - LEED 2008, v2 - Schools 2007, v2 - LEED 2.2, v2 - LEED 2.0
Inquiry
For two new buildings being constructed on a campus with an existing solar farm, is it acceptable to submit both these buildings for EAc2, provided that the total amount of energy for which credit is being sought is less than the amount produced by the farm?