Rating System
LEED BD+C: New Construction, LEED BD+C: Schools, LEED BD+C: Core and Shell, LEED O+M: Existing Buildings
Rating System Version
v3 - LEED 2009, v3 - LEED 2009, v3 - LEED 2009, v3 - LEED 2009
Inquiry
For a project that is obtaining its energy from a small hydro-electric plant, the energy from which is classified as renewable by the local government, is the use of renewable energy from small hydroelectric plant an acceptable approach to obtain the possible points of the EA Credit 4: On-site and Off-site Renewable Energy?