Rating System
LEED BD+C: New Construction, LEED O+M: Existing Buildings, LEED BD+C: Core and Shell, LEED BD+C: Schools
Rating System Version
v3 - LEED 2009, v3 - LEED 2008, v2 - Schools 2007, v2 - LEED 2.2, v2 - LEED 2.0
Inquiry
In the calculation of EAc4, is it acceptable to count the quantitative cooling loads addressed directly by the direct/indirect evaporative cooling units, that would otherwise be met with chillers, so that the refrigerant in walk-in refrigerators is not given an unfair weight in the calculations?