For a subset of buildings on a campus seeking LEED EB O&M certification, it is proposed to account for chilled water and hot water provided by a central plant by installing flow meters and temperature sensors on the lines into each building. In addition, energy used by the central plant (electricity for chilled water and fuel for hot water boilers) will be monitored so that the portion associated with delivered chilled or hot water to each building can be determined. Confirm if this approach is acceptable.
By clicking logout button below, you will be logged out of all the USGBC and GBCI applications in this browser.
Click the logout button below to continue logging out or cancel button to stay logged in.