Accessibility Tools
- Increase text
- Decrease text
- High contrast
- Negative contrast
- Add grayscale
- Remove grayscale
- Add lightbackground
- Remove lightbackground
- Reset
| Credit Name | MRc2 - Construction waste management |
|---|---|
| Credit Category | Material & resources |
| International Applicable | Yes |
| Campus Applicable | No |
LEED BD+C: New Construction, LEED BD+C: Core and Shell, LEED BD+C: Schools, LEED ID+C: Commercial Interiors, LEED O+M: Existing Buildings
v3 - LEED 2009
Can waste diversion rates be documented as an average recycling rate for an integrated waste management operation serving a market area as opposed to the average for a single facility?\nDoes the USGBC offer a prescriptive method for facilities to back-up commingle recycling percentage claims? Is visual inspection of project loads an acceptable method for documenting recycling rates? \nWhen calculating recycling percentages the USGBC does not seem to have a limit on how much ADC can be claimed as a "recyclable" commodity.
By clicking logout button below, you will be logged out of all the USGBC and GBCI applications in this browser.
Click the logout button below to continue logging out or cancel button to stay logged in.
