Created on LEED Interpretation

ID#

li-10101

Credit NameMPR2 - Must be a complete, permanent building or space
Credit CategoryMinimum program requirements
International ApplicableYes
Campus ApplicableNo

Rating System

LEED BD+C: New Construction, LEED BD+C: Core and Shell, LEED BD+C: Schools, LEED BD+C: Data Centers, LEED BD+C: Hospitality, LEED ID+C: Retail

Rating System Version

v3 - LEED 2009

Inquiry

The project consists of an 82,000 sf horizontal distribution center/warehouse addition to a 69,000 sf existing distribution center/warehouse building. The addition will be physically distinct and will have its own unique address. All MEP systems will be separate from the existing building. The demising wall, or party wall, will be 2-hour rated and will have openings for forklift travel to move product between buildings. Openings will be limited to forklift travel and will have rapid open/closing doors on fusible link for fire separation. With minimal party wall openings, with doors that are designed to be normally closed, we assume this complies with the MPR for additions. Please advise.