ID#
li-10159
| Credit Name | EAp2 - Minimum energy performance |
|---|---|
| Credit Category | Energy & atmosphere |
| International Applicable | No |
| Campus Applicable | No |
Rating System
LEED BD+C: New Construction, LEED BD+C: Core and Shell, LEED BD+C: Schools, LEED BD+C: Retail, LEED BD+C: Healthcare, LEED BD+C: Data Centers, LEED BD+C: Hospitality, LEED ID+C: Commercial Interiors, LEED ID+C: Retail, LEED ND: Built Project
Rating System Version
v3 - LEED 2009, v2 - Schools 2007, v2 - LEED 2.2, v2 - LEED 2.0
Inquiry
The project consists of a consumer products manufacturing facility.The energy intensive manufacturing process exceeds an estimated 90% of the facility\'s total energy load. The Project Client has developed a new manufacturing process which consumes approximately 15% less energy per produced than the previous generation process.The new proprietary process has recently been installed at a similar facility and energy reduction has been demonstrated. Since industrial energy for manufacturing is not covered by ASHRAE 90.1-2007 and the building cannot be accurately modeled using the Appendix G method, project team is seeking to establish and obtain approval of an alternative compliance path.\n\nFollowing the Appendix G procedure would be very challenging because there are so many interacting process and non-process systems. Artificially segregating the systems in the model would not reflect energy consumption patterns accurately. Focusing on non-process components that represent less than 10% of the total energy consumption would not demonstrate the majority of the facility\'s energy savings. Manufacturing process improvements targeted at the other 90% of energy usage have a much greater impact on the entire facility\'s energy consumption. Instead of creating an energy model, baseline and proposed energy consumption will be compared by utilizing an Energy Consumption Index (ECI), which is recognized by the Association of Energy Engineers as an accepted methodology for calculating energy consumption in a manufacturing facility. The Project Client has tabulated historical overall site energy data and production at an existing facility which uses only the previous generation manufacturing platform and is also tabulating data from a site with new generation equipment. The energy data from both of these plants is not sub-metered between process and building loads because there is little economic benefit to meter the small building-only loads. An alternative compliance path will be established using the overall site ECI. Please verify that the following method may be used for determining the entire facility\'s energy cost savings.\n\nPROPOSED COMPLIANCE PATH:\n1. Baseline Building:\nThe existing baseline site