This credit requires 6 inches of sub base. In some scenarios, project teams report that < 6 inches could be used to meet the intent of the credit. Is it acceptable if the sub-base is not 6-inches, but a soils expert can validate that the sub-base being installed can handle a 2-year 24-hour design storm?
By clicking logout button below, you will be logged out of all the USGBC and GBCI applications in this browser.
Click the logout button below to continue logging out or cancel button to stay logged in.