Accessibility Tools

  • Increase text
  • Decrease text
  • High contrast
  • Negative contrast
  • Add grayscale
  • Remove grayscale
  • Add lightbackground
  • Remove lightbackground
  • Reset
Created on LEED Interpretation

ID#

li-1742

Credit NameEAp2 - Minimum energy performance
Credit CategoryEnergy & atmosphere
International ApplicableYes

Rating System

LEED BD+C: New Construction

Rating System Version

v2 - LEED 2.2

Inquiry

This CIR has two parts. Please confirm following approach to meet LEED NC 2.2 EA P2 is acceptable for certification purpose. 1. The envelope design has opted to use trade-off method using COM Check program to demonstrated compliance with ASHRAE 90.1 2004. As per CIR ruling 12/5/2005 COMCheck program can be used to prove and submit compliance with ASHRAE 90.1 2004. Please confirm that using this program this is acceptable for LEED NC 2.2 certification. 2. The project includes development of a park which will handed over to the City. The lighting on the park is dictated by the city\'s regulations and might not be within limits required by ASHRAE 90.1 2004. We will submit documentation with the city\'s lighting codes and non-compliance areas. Because the project design and owner have no control in reducing the lighting wattage, we request an exception to the rule. All other grounds and exterior lighting in the project realm is within the specified ASHRAE 90.1 2004 limits.

Logging out the application..